Connected Load Change
Reduction/enhancement of connected load/contract demand on request by the consumers.
Note: Consumers shall apply for enhancement of contract demand in case of consumers under demand-based tariff and of connected load in the case of others.
- The applicant should be the legal owner/tenant/occupant of the property/building.
-
The application for enhancement of load shall not be considered if the consumer is in arrears of payment of the dues payable.
-
Any application for reduction of connected load or contract demand shall be accepted only after six months from the date of original energization for LT connections and only after one year from the date of original energization for HT or EHT connections.
- Request for reduction of connected load or contract demand shall be entertained only once in six months thereafter.
- SINGLE PHASE: Application fees: Rs. 25/- ; Inspection Fee: Rs. 25/-
- THREE PHASE: Application fees: Rs. 25/- ; Inspection Fee: Rs. 50/-
If the enhancement of load is feasible, the consumer shall:-
pay an additional security deposit, expenditure for alteration of service line and apparatus, if any, required to be made, and the cost to be borne by the consumer for modification of distribution system if any, within fifteen days of receipt of the demand note; and
execute a supplementary agreement.
- Proof Of Identity (
Electoral ID card / Passport / Driving License / Ration Card / Photo identity Card issued by any Government Department or agency or PSU / PAN Card / Aadhar Card / Photo Identity Certificate from village Panchayat or Municipality or Municipal Corporation )
- Work completion certificate and Test report from licensed electric contractor
- Sketch showing the load
- Test report of the Energy Meter, if the consumer purchase the meter in case of Phase conversion
- Once application is submitted by the consumer through any of the channels provided by KSEBL, the application will be received at the concerned section office were service is requested.
- On receipt of the application form, the section official will verify the application form and assign an official for providing requested service as per the delegation of powers.
- The assgined official will conduct site inspection if required, within the stipulated time specified in the Kerala Electricity Supply Code 2014 and assess the requirements required for providing requested service.
- An estimate of works required for effecting the requested works will be prepared by the inspecting official and submitted for approval
- As per the inspection report, sanction will be given if in order and demand note of the estimated amount will be raised as per the cost data approved by KSERC if any works are required for effecting the requested service.
- Once the consumer remits the estimated amount, priority will be assigned for completing the works involved in effecting the requested service.
- Officials will be assigned for completing the service at premises of the consumer and also for updating the service status in softwares
- Requested service will be effected within stipulated time mentioned in the Kerala Electricity Supply Code 2014
For more details refer chapter V of the Supply code 2014
Apply Now